S
spek1098
Guest
The fuse box is rebuilt, the donor car is all but in pieces, and all the parts I need are on order, so it's time for a rebuild event. Anyone with some spare time who would like to throw some wrenches around is welcome. I plan to get going around 10 or 11 am, and may go till around 9 pm or so (sooner if all goes well).
Things to do:
There are a few things I need to figure out before she will run (like a smashed connection on the CDFP that will need some TLC) but hopefully I can tackle these this week.
Things to do:
- Install MS3 Front Suspension w/Cobb Springs and FSB
- Install DISI Engine
- Remove Mz3 Fuel Tank and Install MS3 Fuel Tank
- Drop Rear Subframe on MS3 (3 Bolts left) and install Cobb Springs and RSB
- Drop Mz3 Rear Subframe and Install MS3 CBE and Rear Subframe
There are a few things I need to figure out before she will run (like a smashed connection on the CDFP that will need some TLC) but hopefully I can tackle these this week.
Last edited by a moderator: