Installed Friday night in about 1 hour 45 minutes. Went pretty well. So far so good for the bed in process. I followed the instructions that came with the pads to a T. 6-10 30mph medium stops and 4-6 45mph heavy stops. Let sit for at least 15 minutes to cool.
Had a knocking noise, but that turned out to be a loose lug nut or two that allowed very slight play up against the rotors. Clamped those back down and nothing since.
I haven't railed on 'em yet, giving them some time before I do. Other than that, intial impressions are positive, but it's only been a few days.